About the Futuro Ring System
With over 20 years of continuous manufacturing by the Altrad Group, the Futuro system has been refined to deliver exceptional performance. Hot-dipped galvanised for durability and fully compliant with European Standards EN12810 and EN12811-1, Futuro has also been audited by the NASC to ensure it meets – and in many cases exceeds – the UK code of practice for proprietary system scaffolds.
From domestic builds and commercial projects to industrial and civil engineering works, Futuro scaffolding is designed to adapt. Its optimised disc system, offering eight connection points, provides unrivalled flexibility and load-bearing capability – making it ideal for complex construction and infrastructure demands.
The Futuro Ring System features galvanised steel perforated decks with drop-forged claws and integrated deck retainers, available in up to eight bay lengths for precision across a wide range of projects. Compared to traditional tube and fitting scaffolding, Futuro can reduce erection times by up to 40%, while also cutting down on manual handling through multi-purpose components. This not only boosts site efficiency but also helps to reduce overall costs.